One Tonner Judel & Vrolijk

 
Dimensions
11.97 x 3.92 x 2.20
Building material
Composite
Berthing
Sales marina
Building year
1989
Survey
Yes
Asking price
€ 34.900

Contact Print

One Tonner Judel & Vrolijk indelingstekening

GENERAL

Building year
1989
Dimensions
11.97m x 3.92m x 2.20m
Builder of the hull
Knierim
Designer
Judel & Vrolijk
Hullshape
Roundbilge
Shape of keel
Finkeel
Building material
Composite
Displacement
Ca. 6.3 ton
Ballast
Ca. kg
Hull finishing
Yard
Interior finishing
Mahogany
Deck
Composite
Deck-cabins
Composite
Enclosed wheelhaus
-
Number of cabins
2 (inclusief salon)
Bunks
6
Mast-clearance
Ca. 19.0 meter
Headroom-fore
Ca. 1.70 meter
Headroom saloon
Ca. 1.85 meter
Headroom aft-cabin
Ca. --- meter
Window material
Perspex
Steering
Tiller
Remarks
From 2010 to 2014 TOLENZA big maintenace has been done.
-new underwatership with Flexshield (thick-film epoxy).
-the underwater ship in the stern area was straightened
-keel added lead bomb of approx. 500 kg weight.
-all stanchions as well as the pulpit and pushpit were made from V4A
-Both the entire running rigging and a lot of deck fittings as well as all jib rails / pulleys and the traveler incl. mainsheet fittings were renewed
-the backstays were finished in 2017 sheathed Dyneema ropes completely renewed
-the deck was completely redesigned and provided with an anti-slip epoxy coating.
-Interior renewed, during which the entire electrical system was renewed.
-A new VW marine diesel engine and a large Flexofold folding propeller was put in

ENGINE

Brand and type
VW VW068.2/M344
Building year
2010
Building number
06508
Vermogen
35 pk (26 kW)
Fuel
Diesel
Fuelconsumption
Ca. 2 liter per uur
Transmission
Propellor shaft
Cooling
Indirect
Fueltanks material
Plastic
Fuel tanks
App. 110 liters
R.p.m. gauge
+
Hourcounter
+
Oil pressure gauge
+
Temperature gauge
+
Engine hours
App. 530 hour
Propellor
Flexofold folding
Bowprop
-
Hekschroef
-
Remarks
New fuel tank 08-2024

RIGGING

Type of rigging
7/8
Material of spars
Aluminium
Fittings
Stainless steel
Material stays
Rod rigging
Mainsail
Fully battened mainsail Quantum Fusion MR 5300 2019
Try Sail Sailselect Off-shore/racing 9 Oz 2024
Other sails
Genoa Quantum Fusion Racing 2MR 5000 2018
genoa III Quantum 2020
Stormjib Sailselect Off-shore/racing 9 Oz 2024
Light weather sails
Spinnaker
Reefing
Bindrif
Spinnaker pole
+
Decksails
Zeilhuik
Winches
8x
Remarks
2x Lewmar 48 AST + Lewmar 50 AST new sept 2018, Rigid boom vang (Rodkick new 2018, extra strong gas spring)

ELECTRICAL SYSTEM

Batteries
Wilco 105AH 2024 + 1x start
Tension
12 V
Shore power
220 V
Battery charger
+
Generator
-
Voltmeter
+
Amperemeter
+

NAVIGATION

Compass
Plastimo Contest 130 (2023)
Echosounder
Garmin 4x GMI + 2x GNX120 7 i
Log
Garmin 4x GMI + 2x GNX120 7 i
Airspeedindicator
Garmin
Marine radio telephone
Garin VHF 110I (2021)
Radio
Fusion
Autopilot
Garmin 6HC10 + Raymarine
GPS
Garmin 19X (2020)
AIS
Garmin AIS 800 (2022)

GAZ AND WATER

Material watertanks
+
Watertanks
App. 110 new 2024 liters
Hot water system
-
Indoor shower
-
Toilet
1
Vuilwatertank;
-
Refridgerator
+
Tankwell
-
Stove
Not present
Oven
-
Heating
Autoterm/Planar new 10-2023
Heating fuel
Diesel

ON DECK

Second rudder control
-
Material pulpit
Stainless steel
Safety railing
Stainless steel
Anchorwinch
-
Swimming platform
+
Swimladder
+
Anchor
-
Anchorchain
-

V.A.T. AND REGISTER

V.A.T.
Not demonstrable payed
Registered
Not registered
Survey
Yes

SURVEYREPORT

 

This yacht has been tested on 27-11-2024 by Expert Pleziervaartuigen. During the yacht inspection the yacht was assessed on a number of components:

  • vessel under the waterline
  • vessel above the waterline
  • deck, structure and cockpit
  • rigging
  • inside hull
  • construction
  • interior
  • electrical installation
  • built-in gas installation
  • steering
  • engine unit
  • trial run
  • inventory/equipment

    Conclusion of the yacht inspection
    The condition test of the yacht as carried out has at the present time resulted in the following (final) assessment:

  • General condition
    Sufficient